After a long debate, the National Assembly decided that Kozloduy NPP- New Builds and Hyundai Engineering & Construction hold negotiations by April 15. Hyundai was shortlisted as a potential contractor for the engineering, construction and commissioning of Units 7 and 8 at Kozloduy NPP, using Westingouse’s AP 1000 technology.
After a re-vote, the decision was adopted with 112 votes in favour, 29 against and 82 abstentions. With 52 votes in favour, 161 against and 8 abstentions, the parliament rejected another draft decision submitted by "We Continue the Change-Democratic Bulgaria" to hold parallel negotiations with Hyundai and the American company Bechtel.
The assets of private pension funds have reached EUR 13 billion. According to data from the Financial Supervision Commission, they have increased by more than 20% compared to the same period last year. As of September 30, 2024, the number of..
There has been an upsurge in the economy in every region of Bulgaria, the effects of the Covid crisis have been overcome, tourism has fully recovered, which is evident in Bulgarian seaside regions and spa resorts - this is the conclusion that is drawn..
More than EUR 1 billion will be invested in agriculture and rural areas in Bulgaria in 2025. According to a decision by the Monitoring Committee of the Strategic Plan for Agricultural Development, the funds are aimed at modernizing agriculture and..
+359 2 9336 661