After a long debate, the National Assembly decided that Kozloduy NPP- New Builds and Hyundai Engineering & Construction hold negotiations by April 15. Hyundai was shortlisted as a potential contractor for the engineering, construction and commissioning of Units 7 and 8 at Kozloduy NPP, using Westingouse’s AP 1000 technology.
After a re-vote, the decision was adopted with 112 votes in favour, 29 against and 82 abstentions. With 52 votes in favour, 161 against and 8 abstentions, the parliament rejected another draft decision submitted by "We Continue the Change-Democratic Bulgaria" to hold parallel negotiations with Hyundai and the American company Bechtel.
Bulgaria’s industry is being transformed in the direction of high added value productions, reads an analysis by the Institute for Market Economics. This tendency is best manifested in computer science, electronics and optics which account for the..
Acceleration of inflation to 1.1% in October compared to the previous month was registered by the National Statistical Institute. On an annual basis, the index is 1.8 percent. In October, the prices of goods and services for..
A working group comprising representatives of employers, trade unions and government experts is discussing the proposals of the Ministry of Labor and Social Policy for introducing a new mechanism to determine the minimum wage. This is happening a day..
The assets of private pension funds have reached EUR 13 billion. According to data from the Financial Supervision Commission, they have increased by..
+359 2 9336 661