The transition from Russian nuclear fuel from "TVEL" to the American fuel from "Westinghouse" will start in May with the loading of 43 cartridges in the reactor core of the fifth unit of the Kozloduy NPP. The process of replacing the cartridges will last 4 years. This was announced at a briefing by the chair of the Nuclear Regulatory Agency, Tsanko Bachiyski, quoted by BTA.
The executive director of Kozloduy NPP, Valentin Nikolov, recalled that the process of preparation for switching to Westinghouse fuel began in 2019 with the signing of a contract with the company. According to him, during the entire period, control was also carried out over the production process of assembling the nuclear fuel.
"When I look at the CCTV footage, I have the feeling that some of the sectional election commissions did not work according to the rules." That is how chair of the CEC, Kamelia Neikova, commented information about manipulations related..
By order of caretaker Prime Minister Dimitar Glavchev, the institutions are ready to provide assistance to Spain after the floods in Valencia, the Council of Ministers reported. If the authorities in Madrid request support,..
In the elections on October 27 this year there were problems in both phases of the process - when the votes were submitted and when they were counted, former acting minister of interior Ivan Demerdzhiev told the BNR. According to him,..
Over 1/3 of the cases of African swine fever among wild boars in Europe have been registered in Bulgaria , the Association of Pig..
An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities..
On Tuesday , the lowest temperatures will be between minus 3° and 2°C, in Sofia - around minus 1°C. During the day it will be sunny,..
+359 2 9336 661