Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgarian President calls for quick completion of the Alexandroupolis LNG terminal

Photo: m.president.bg

President Rumen Radev has held a working meeting with Greek Prime Minister Kyriakos Mitsotakis. In Athens, they discussed the urgent activation of work on strategic bilateral projects. At a briefing, Radev said that the liquefied natural gas terminal at Alexandroupolis is a strategic project, which should be operational by October. The terminal still has technical issues that are being fixed. Bulgaria participates in the project after acquiring 20% of it, Radev recalled.

Regarding Skopje's call to change the Treaty of Friendship, Good-Neighbourliness and Cooperation, President Radev said: "Unfortunately, the state leadership of North Macedonia is clearly not ready for the position. Knowledge of international law is necessary. When an international treaty is signed, it must is implemented by all subsequent governments and not be revised." He added that knowledge of statistics is also needed, as 120,000 North Macedonians already have Bulgarian citizenship, as they have proven and documented Bulgarian origin, BTA reports.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria’s Consul General in Chicago attends Democratic National Convention

Svetoslav Stankov, Consul General of Bulgaria in Chicago, the US, took part in the Democratic National Convention, Svetoslav Stankov himself announced on Facebook. His participation is an expression of the excellent relations between Bulgaria and the..

published on 8/22/24 11:39 AM
Veselin Nalbantov

Workers from Asia disappear from hotels on Black Sea coast

There is a channel for the transfer of workers to Western Europe, said Veselin Nalbantov, deputy chairman of the Bulgarian Hotel and Restaurant Association.  Mysterious disappearances of Nepalese and Sri Lankan workers on the Black Sea coast..

published on 8/22/24 9:53 AM

RES-generated electricity will reach 50% by 2033, according to electricity network transmission plan

According to the plan for the development of the electricity transmission network of Bulgaria 2024-2033 of the Electricity System Operator, as of 2033, production from renewable energy sources (RES) will exceed 50% of the projected electricity..

published on 8/22/24 8:49 AM