Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

No active fires in the country, situation along Greek border is being monitored

Photo: BTA

There are no active fires in the country right now, the Bulgarian Ministry of the Interior announced. The fire in the villages of Voden, Kraynovo and Strandzha near Yambol has been contained on all fronts. On Tuesday, a walkthrough will be made and if there are no active outbreaks, equipment and personnel will be redeployed.

For the fourth day, the struggle of the Greek firefighters with the big fire on a front of 15 km continues near the Bulgarian-Greek border in Slavyanka mountain. The fire has not yet entered Bulgarian territory. Bulgarian firefighters, foresters, military and gendarmerie are on duty with equipment, monitoring the situation.

The fires were localized in dry grasses, deciduous forests and bushes in the lands of the villages of Ovchepoltsi and Tsar Asen in the municipality of Pazardzhik, as well as near Kocherinovo train station.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Kristian Vigenin

If BSP receives the third mandate, it will try to form expert cabinet (UPDATED)

The return of the second mandate was not unexpected, deputy chairman of the BSP Kristian Vigenin said. According to him, forming a government within the framework of the 50th parliament is increasingly difficult to achieve...

published on 7/22/24 2:28 PM

PP-DB returns the second mandate immediately after it was handed over

President Rumen Radev handed over the second exploratory mandate to form a government to the second largest parliamentary group in the 50th National Assembly - "We Continue the Change" - "Democratic Bulgaria" coalition (PP-DB).  At the handing..

published on 7/22/24 12:14 PM

Caretaker government signs contract for East-West energy corridor feasibility study

A contract between the US Trade and Development Agency and the Electric Power System Operator for the feasibility study for the East-West Energy Corridor was signed at the Council of Ministers.  The funding, amounting to USD 1.2 million, is..

published on 7/22/24 11:26 AM