Representatives from Bulgaria and North Macedonia participated in a working meeting dedicated to the Corridor No. 8 railway, the Ministry of Transport announced. The institution specifies that the meeting planned for October 16 in Brussels was held on October 31 in Sofia.
After analysing the technical possibilities and assessing the risks, the participants agreed that the Deve Bair cross-border tunnel facility should be built by a single contractor. The representatives of the European Commission, the European Bank for Reconstruction and Development and the European Investment Bank have expressed support for this technical solution and readiness to assist in the preparation and conduct of the tender procedure. Which of the countries will conduct the public procurement for the contractor of the tunnel facility will be decided in subsequent talks with potential financing institutions.
“Investing in people, education, innovations and technologies is the key to success in the future,” said President Rumen Radev at the opening of the business forum in Singapore, in which representatives of companies from Bulgaria and Singapore are..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she said she was optimistic about Austria’s decision. Asked what the arguments are for blocking the..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th National Assembly, to be declared unconstitutional. These amendments concern the lifting of the..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would..
Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus..
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07..
+359 2 9336 661