Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
PP-DB have doubted the possibility of the 50th National Assembly to produce a government. At a briefing on the sidelines of the parliament, the co-chairman of the coalition Asen Vassilev rejected the possibility of "returning the..
Until the average income of the population reaches 80% of the European average, we should not enter the euro area. Inflation goes along with it and there must be some reserves, Georgi Kadiev, former Deputy Minister of Finance, part of..
There are four times as many people dying of brain stroke in Bulgaria compared to other EU countries , according to a 2021 report by the European Commission. In 2023, 45,000 brain stroke patients were registered in Bulgaria, of which more than..
Ivan Ivanov, chairman of the Energy and Water Regulatory Commission, announced that a decision would be taken today on how to compensate green energy..
The hacker "Emil Kyulev", who broke the database of state institutions, banks and legal entities, was caught The Sofia City Prosecutor's Office..
There is nothing in the country’s position, approved by the Council of Ministers for the NATO summit in Washington that infringes on our national..
+359 2 9336 661