Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
After an accident that took place when Unit 6 of the Kozloduy NPP was shut down for repairs, no personnel were exposed to radiation, no leakage of radioactive water into the Danube River occurred, and some operators from the plant..
PP-DB have doubted the possibility of the 50th National Assembly to produce a government. At a briefing on the sidelines of the parliament, the co-chairman of the coalition Asen Vassilev rejected the possibility of "returning the..
Until the average income of the population reaches 80% of the European average, we should not enter the euro area. Inflation goes along with it and there must be some reserves, Georgi Kadiev, former Deputy Minister of Finance, part of..
The Bulgarian Development Bank (BDB) is starting "unlimited" financing for the country's defense industry. According to caretaker Minister of..
Caretaker Minister of Interior Kalin Stoyanov is attending the ministerial conference of the Salzburg Forum countries in Vienna, the Ministry of..
An alert of the highest threat level issued by one of the most influential intelligence services in the world is the reason why the home of GERB leader..
+359 2 9336 661