Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
In a letter to Minister of Education Galin Tsokov, the Bulgarian Industrial Capital Association expresses concern over the state plan for admissions for the 2025-2026 academic year, in which the number of vocational classes in schools are being..
The Sofia City Prosecutor’s Office has initiated pre-trial proceedings regarding an organized criminal group for the trafficking of migrants, the prosecutor’s office has announced. Evidence was collected during the investigation regarding 16..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the Ministry of Interior announced on International Day for the Elimination of Violence against Women. A..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
After the meeting with his Vietnamese counterpart Luong Cuong in Hanoi, President Rumen Radev emphasized that Bulgaria will continue to support efforts..
As of next year, use of solid fuels for domestic heating in buildings which are part of central heating and gas supply networks will be banned in nine..
+359 2 9336 661