Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

NPP Kozloduy Unit 5 planned repair: measures include power upgrade

Photo: Lora Indzhova

Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair. 




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgarian Vice President opens exhibition dedicated to ancient Thrace in Getty Museum

God has gifted people with an incredible quality - to dream. And we dreamt of hearing Bulgarian in the Getty Museum during the opening of an incredible exhibition. An exhibition dedicated to an ancient people, an exhibition that..

published on 11/4/24 8:47 AM

Kozloduy NPP signs engineering contract for new nuclear facilities with Hyundai and Westinghouse

An engineering contract for the construction of new nuclear facilities at Site No. 2 of the Kozloduy NPP will be signed today with Hyundai and Westinghouse. According to caretaker Minister of Energy Vladimir Malinov, the..

published on 11/4/24 8:30 AM

The new week starts with some clouds

Monday will be mostly sunny with scattered high clouds. The lowest temperatures will be between 0° and 5°C; in Sofia - about 1°C, and the highest will reach between 13° to 18°C; in Sofia - about 14°C. In the mountains it will..

published on 11/3/24 6:15 PM