Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Prime Minister Boyko Borissov expects EC to allow direct gas pipeline from Russia

Photo: BGNES

Bulgarian Prime Minister Boyko Borissov has announced he is waiting for a letter from the European Commission that would allow a link to the Turkish Stream gas pipeline project to reach Bulgaria directly so deliveries are not to be dependent on Turkey.

The pipeline capacity for Bulgaria is expected to be 15.7 billion cubic meters of gas. At the same time, it became clear that Moscow was planning a second pipe of "Turkish Stream". It is currently believed that it would go directly to Turkey, and from there natural gas will enter Europe either through Bulgaria or Greece.

Chances of Bulgaria to get these 15.7 billion cubic meters of gas have increased significantly in recent months. Bulgaria has also received indirect support from Serbia, Hungary and the Austrian giant OMV, who called that the pipeline should pass through this country.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

In Washington DC caretaker PM Glavchev stated that Bulgaria is a reliable ally within NATO

During a discussion with US President Joe Biden at the 75 th anniversary NATO summit in Washington DC, Bulgaria’s caretaker Prime Minister Dimitar Glavchev stated that Bulgaria is a loyal and reliable ally. On his part, President Biden expressed..

published on 7/10/24 8:54 AM

Travelling exhibition highlights endangered species in Heraclea Sintica

The travelling exhibition "Traces of Extinction" features casts of the footprints of endangered species in the Rhodope Mountains. The casts are made of biomaterials that replicate the animals' actual forms and habitats, reports BTA. The exhibition will..

published on 7/10/24 7:20 AM

Major repairs to Danube bridge at Ruse begin

Major repairs to the Danube bridge at Ruse begin on 10 July, the Road Infrastructure Agency has announced.  The work will be carried out daily during daylight hours for 10-12 hours a day, depending on the specific work to be carried out, and there..

published on 7/10/24 6:50 AM