With an investment cost of less than EUR 10.5 billion, with a ratio of 70:30 for attracted and own capital and an interest rate below 4.5%, the Belene NPP project is viable. This is the conclusion in an analysis made by the Bulgarian Academy of Sciences that has been commissioned by the Bulgarian Energy Holding.
The project would become significantly more viable in case the state is involved. In the region there is a shortage of base capacity of about 2000 MW. The worst option is if nothing is done on the Belene project, the Bulgarian Academy of Sciences said.
"The ultimate decision for Belene should only be made after a broad discussion of this analysis”, Energy Minister Temenuzhka Petkova commented at the presentation of the report. She stressed that the Belene N-plant decision should be made quickly but not hastily.
There is no immediate danger to the Bulgarian waters or to the Bulgarian coastline. The oil spill is drifting to the Southeast of Kerch Bay and to the North of the Kerch strait, and there exists a serious danger of pollution of the Sea of Azov, said..
BNR - "Horizont" has the draft agreement for 10-year cooperation in the field of security between Bulgaria and Ukraine. The 20-page document, the signing of which was postponed, stipulates that Bulgaria will provide training for..
Vazrazhdane party are to file a signal to the State Agency for National Security (SANS) over an attempt to "massively recruit" hundreds of Bulgarian municipal councillors, said Kostadin Kostadinov, leader of the party. He told media..
An avalanche has fallen in Pirin Mountain close to Bansko ski resort and has buried people . The Mountain Rescue Service has reported that one of the..
On Saturday, a cold front will sweep across the country. During the night there will be rain in Western and Central Bulgaria, and snow in the..
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of..
+359 2 9336 661