Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Gas hub feasibility study starts

Photo: BGNES

Bulgarian gas operator Bulgartransgaz and Bulgarian-Swiss consortium AF-EMG Consult have signed a contract for the feasibility study of the planned Balkan gas hub.

Within a period of 40 days the consortium will present an interim report, while a comprehensive survey will be prepared in a period of 110 days. The feasibility study will detail the commercial and technical viability of the project and will identify the exact business model for its realization, as well as target markets, demand and supply sources of natural gas.


Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

President Radev: Bulgaria is one of the spiritual centres of Europe

Bulgaria is hosting the international forum on the Cyrillic alphabet "Alphabet. Language. Identity" where more than 30 scholars from 12 countries are taking part.  At the opening of the event  in the National Palace of Culture in Sofia, President..

published on 6/27/24 11:52 AM
Dimitar Glavchev

Bulgaria will defend its position on Republic of North Macedonia

At the European Council, Bulgaria will insist on including a text on the Republic of North Macedonia in the adoption of the conclusions of the meeting , the government press service said.  Caretaker Prime Minister Dimitar Glavchev is representing..

published on 6/27/24 10:45 AM

Authorities block website that was in contact with organized crime group

The General Directorate for Combating Organised Crime has taken part in an international operation led by the French authorities, which blocked a website considered to be a communication channel of organised crime groups , the press centre of the..

published on 6/27/24 10:41 AM