Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Gas hub feasibility study starts

Photo: BGNES

Bulgarian gas operator Bulgartransgaz and Bulgarian-Swiss consortium AF-EMG Consult have signed a contract for the feasibility study of the planned Balkan gas hub.

Within a period of 40 days the consortium will present an interim report, while a comprehensive survey will be prepared in a period of 110 days. The feasibility study will detail the commercial and technical viability of the project and will identify the exact business model for its realization, as well as target markets, demand and supply sources of natural gas.


Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgarian-African Chamber of Commerce to develop relations with the Bulgarian Chamber of Commerce and Industry

Representatives of the Bulgarian-African Chamber of Commerce visited the Bulgarian Chamber of Commerce and Industry and met with its President Tsvetan Simeonov. Albena Jones, Dimitar Turlakov, and Anton Samsonov are among the founders of..

published on 2/19/25 9:08 AM
Photo: Jérémie Bergeron/Radio-Canada

Ministry of Foreign Affairs cautions Bulgarians on severe weather in Canada

The Ministry of Foreign Affairs recommends that Bulgarian citizens traveling or residing in Canada keep themelselves well-informed about the current weather conditions, and regularly check the status of their flights. The Canadian Meteorological..

published on 2/19/25 8:55 AM

Ministry of Finance releases 2025 draft budget

The Ministry of Finance published the 2025 draft budget and the medium-term budget forecast for the 2025-2028 period. The projected deficit for 2025 is up to 6.4 billion BGN (EUR 3.3 billion), which is 3% of GDP.  Expenditures will not exceed 40% of..

published on 2/19/25 8:42 AM