The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
On Saturday lows will be between 5 and 10°C, around 7°C in Sofia. Before noon it will be mostly sunny and calm. In the afternoon there will be isolated showers and thunderstorms. Maximum temperatures will be between 20 and 25°C, around 21°C in the..
Bulgarian President Rumen Radev has long been involved in the political life of the country, and now he wants to take on the role of opposition leader. This was stated by Finance Minister Temenuzhka Petkova in Targovishte. "After nearly four..
In 2024, the poverty line in the country was €375 per month on average per person in a household. A total of 1,401,300 people, or 21.7% of the population, were living below the poverty line , according to the National Statistical Institute (NSI)...
In 2024, Bulgaria spent USD 2.208 billion (3.964 billion BGN), or 2.04% of its GDP, on defense, reads the annual report of NATO Secretary General Mark..
On January 1, 2026, Bulgaria will take over the presidency of the Danube Strategy for the second time (after 2018) . This is happening at a..
A children's hospital for active treatment will open in Burgas by the end of the year, it became clear during the inspection of its..
+359 2 9336 661