“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
Caretaker Minister of Defense Atanas Zapryanov took part in the 25th meeting of the Ukraine Defense Contact Group at the level of Ministers of Defence at the Ramstein Air Base in Germany. There, Minister Zapryanov said that in line with the decisions..
On January 10 and 11, flower enthusiasts can treat themselves to an exciting walk in the tropical greenhouse of the Botanical Garden of the Bulgarian Academy of Sciences. Visitors will have the opportunity to enjoy the charming blossoms of..
On Friday morning there will be fog or low clouds in the lowlands and valleys. Minimum temperatures will be between -3°C and 10°C in the Pre-Balkan, around 1°C in Sofia. Visibility will improve after midday, but clouds will increase from the north-west..
I have not committed any crime, this is a political attack, the co-chairman of "We Continue the Change" (PP), Kiril Petkov, said before..
NATO will deploy 10,000 soldiers, 17 ships, 20 aircraft, 1,500 combat vehicles and artillery in Bulgaria, Romania and Greece during Steadfast Dart 2025...
Snow clearing operations continue in Sofia. A total of 170 machines are treating the streets and boulevards with anti-icing mixtures, said the press..
+359 2 9336 661