“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The co-chairman of the parliamentary group of “BSP-United Left”, Atanas Zafirov, expressed hope that this country would have a regular cabinet next week. “Today and tomorrow are important days, I hope that this knot will..
About 70 million euros were invested last year for improving the infrastructure of military bases, the caretaker Minister of Defense Atanas Zapryanov said. The Ministry of Defense issued 40 permits for the construction of new..
MPs have given themselves a three-day deadline to submit written proposals before the second reading of the amendments to the Judiciary Act, which aim to suspend the election of a new prosecutor general. The vote for the next chief..
Bulgaria has made significant progress in meeting the criteria for inclusion in the U.S. Visa Waiver Program, caretaker Minister of Foreign..
I have not committed any crime, this is a political attack, the co-chairman of "We Continue the Change" (PP), Kiril Petkov, said before..
The General Consulate of Bulgaria in Los Angeles warned on its Facebook page that the fires in the metropolis have caused water contamination..
+359 2 9336 661