“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
I have not committed any crime, this is a political attack, the co-chairman of "We Continue the Change" (PP), Kiril Petkov, said before entering the Prosecutor's Office. Outside the building there were PP sympathizers and MPs who..
Our full accession to Schengen is an achievement of many governments and many teams, and we will not allow a spoonful of tar to be added to this, said caretaker Premier Dimitar Glavchev, who visited today the Danube Bridge border checkpoint in Ruse...
Bulgaria has made significant progress in meeting the criteria for inclusion in the U.S. Visa Waiver Program, caretaker Minister of Foreign Affairs Ivan Kondov said in a written response to MP Martin Dimitrov. Given the requirement to reduce the..
Bulgaria has made significant progress in meeting the criteria for inclusion in the U.S. Visa Waiver Program, caretaker Minister of Foreign..
I have not committed any crime, this is a political attack, the co-chairman of "We Continue the Change" (PP), Kiril Petkov, said before..
The General Consulate of Bulgaria in Los Angeles warned on its Facebook page that the fires in the metropolis have caused water contamination..
+359 2 9336 661