Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.
The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.
On Wednesday morning, visibility will be reduced in some places in the valleys, plains and along the Black Sea coast. Minimum temperatures will range between minus 3 and 2°C, around minus 2°C in Sofia. During the day it will be sunny with highs between..
For the first time in recent election history, the end election result leaves a party running in the election outside the National Assembly with a result of 3.999% (Velichie), 21 votes short of the electoral threshold, reads a position by the..
The Central Election Commission (CEC) is sending the prosecutor the video recordings of the ballot count in 7 polling stations where there is a discrepancy in the number of votes counted. The prosecutors will have to check whether there is..
Over 1/3 of the cases of African swine fever among wild boars in Europe have been registered in Bulgaria , the Association of Pig..
An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities..
On Tuesday , the lowest temperatures will be between minus 3° and 2°C, in Sofia - around minus 1°C. During the day it will be sunny,..
+359 2 9336 661