Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Power produced by Kozloduy NPP's Unit 6 temporarily halved

Photo: BGNES

Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.

The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

85% of witnesses of street harassment do not know how to intervene

A campaign against street violence named Stand Up will be held today and tomorrow under the dome of Sofia's Largo, said the Regional History Museum – Sofia. It turns out that over 80% of women worldwide have experienced some form of street..

published on 11/29/24 6:05 AM

Mural marking 20th anniversary of Bulgaria's NATO accession to be unveiled in Pernik

A mural dedicated to the 20th anniversary of Bulgaria's NATO accession will be unveiled today in Pernik. The event will be attended by the ambassadors of Great Britain, Turkey and Montenegro, Deputy Foreign Minister Nevyana Miteva, Pernik Regional..

published on 11/29/24 5:15 AM

Sharp change in the weather expected on Friday

On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed will reach 10-15 m/s. With it, cold air will invade the country and temperatures will drop and by..

published on 11/28/24 7:45 PM