Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.
The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.
The latest technological solutions, products and projects in the field of agriculture and agro-industry will be presented at the "Agra 2025" exhibition in the halls of the International Fair in Plovdiv, BTA reports. This year's..
On Tuesday, the lowest temperatures will be between minus 5 and 0°C; in Sofia - around minus 5°C. It will remain cold and cloudy with snowfalls over most of the country and rainfall in the southeastern regions. The snow cover will..
Bulgaria’s President Rumen Radev named Sofia Airport after the Apostle of Freedom Vasil Levski, the press secretariat of the head of state announced. Thus, its official name becomes Vasil Levski Sofia Airport. According to the Constitution, the Head of..
The Bulgarian Ministry of Tourism will work to create a map of important, but hard-to-reach tourist and cultural-historical sites. The goal is then to..
Bulgarian Finance Minister Temenuzhka Petkova will travel to Brussels to provide an update on Bulgaria’s progress towards euro area accession. The..
Bulgaria’s President Rumen Radev named Sofia Airport after the Apostle of Freedom Vasil Levski, the press secretariat of the head of state announced...
+359 2 9336 661