Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Protest over entry restrictions at Ilinden-Exochi border check point with Greece

Ilinden-Exochi border check point
Photo: archive

Company owners and members of the public are organizing a protest in Gotse Delchev today to protest against the restrictions set down by the Greek authorities to passage across the Ilinden-Exochi border check point.

At the moment heavy-duty lorries can only enter Greece from 7 AM until 11 PM, a ban on entry of cars and passengers has been in place since November last year.

The people affected by the restrictions say that it makes no sense to keep the check point closed to tourists and trucks as the Covid-19 situation is under control and summer travel to the Greek coastline is at its height. The organizers of the protest have sent letters to the Bulgarian Foreign Ministry and to the diplomatic missions of neighbouring countries affected by the restrictions. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Weather forecast: Over the weekend temperatures will rise

On Saturday the weather will be sunny, with cumulus clouds developing in the afternoon in many parts. Temperatures will continue to rise, with minimum temperatures reaching 15-21° C., for Sofia 17° C. Daytime highs will range from 30° C., to 35° C.,..

published on 7/5/24 6:45 PM

Repair works on the Danube bridge near Ruse to be carried out without stopping traffic

The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian..

published on 7/5/24 6:13 PM

160 more workers laid off at ContourGlobal Maritsa East 3 coal-fired power plant

ContourGlobal Maritsa East 3 TPP has announced that another 160 people from the coal-fired power plant will be laid off in the coming months after the procedure for notifying the institutions and the workers has been completed, the company’s..

published on 7/5/24 4:40 PM