The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
Two curators of the Natural History Museum in Plovdiv started their journey to Antarctica as part of the 33rd Bulgarian Antarctic expedition. The purpose of the trip of Kristiyan Vladov and Stefan Kyurkchiev is to enrich the museum's..
The 28th Eastern Mediterranean International Tourism and Travel Exhibition EMITT 25 has opened in Istanbul and will last until February 7. Experts place it among the five largest tourism exhibitions in the world. The forum is..
In response to President Rumen Radev, who said that the institutions were late in establishing price control bodies, Deputy Prime Minister Grozdan Karadzhov assured that the government would implement all possible mechanisms to..
GERB never falsifies things and it is clear what the hole in the budget is due to. Let's humble ourselves a little and not try to shift..
The official start of the work of the “Vitosha” tunnel boring machine for the expansion of Line 3 of the capital's metro to the..
Bulgaria has fully implemented 7 out of 28 recommendations made by the Council of Europe's Group of States against Corruption (GRECO). 11..
+359 2 9336 661