The energy regulators of Bulgaria and Greece have certified the Gas Interconnector Greece–Bulgaria (IGB).
The commercial exploitation of the interconnector is set to begin after 1 July, 2022. IGB is of strategic importance and allows for the linking of the Greek and the Bulgarian gas transmission systems, diversifying gas supplies to Bulgaria and Southeastern Europe. The interconnector will enable Bulgaria to receive, in the second half of 2022, the full amount of the 1 billion cubic metres of natural gas negotiated with Azerbaijan. The pipeline’s transmission capacity is 3 billion cubic metres, and will allow delivery of liquefied gas from USA, Algeria, Qatar, Egypt, Nigeria, Israel and Cyprus.
The papers have to be approved by the European Commission, in accordance with European norms, before the certificates enter into force.
Monday will be mostly sunny with scattered high clouds. The lowest temperatures will be between 0° and 5°C; in Sofia - about 1°C, and the highest will reach between 13° to 18°C; in Sofia - about 14°C. In the mountains it will..
On the first day of the 51st parliament, ITN will initiate the collection of signatures for submitting a complaint to the Constitutional Court concerning the partial cassation of the elections, party leader Slavi Trifonov announced on..
Vazrazhdane calls for a recount of the votes from the early parliamentary elections, party leader Kostadin Kostadinov has told BNR. "It will perhaps show that there are protocols that do not match with the contents of the bags with..
Slavi Trifonov, leader of There Is Such a People (ITN) declared he would sign the declaration of We Continue the Change/Democratic Bulgaria (PP/DB),..
The recordings from 65 cameras, which streamed the counting of the ballots on election night online, have gone missing, according to a report by the..
We Continue the Change/Democratic Bulgaria (PP/DB), which came second in the 27 October parliamentary election, sent the other political forces to be..
+359 2 9336 661