The energy regulators of Bulgaria and Greece have certified the Gas Interconnector Greece–Bulgaria (IGB).
The commercial exploitation of the interconnector is set to begin after 1 July, 2022. IGB is of strategic importance and allows for the linking of the Greek and the Bulgarian gas transmission systems, diversifying gas supplies to Bulgaria and Southeastern Europe. The interconnector will enable Bulgaria to receive, in the second half of 2022, the full amount of the 1 billion cubic metres of natural gas negotiated with Azerbaijan. The pipeline’s transmission capacity is 3 billion cubic metres, and will allow delivery of liquefied gas from USA, Algeria, Qatar, Egypt, Nigeria, Israel and Cyprus.
The papers have to be approved by the European Commission, in accordance with European norms, before the certificates enter into force.
When carrying out border control and compensatory measures, Border Police officers also carry out checks in the automated information system of the Ministry of Interior for undelivered electronic tickets and for fines imposed that..
Citizens and guests of Veliko Tarnovo are to welcome the Resurrection of Christ in the Tsarevets Fortress. The gates of Tsarevets will be opened at 10:30 p.m. on Holy Saturday and an hour later an Easter service will begin in front..
Traditionally, on the eve of the Easter holidays, the children from the "Tsar Simeon the Great" school in the village of Ivanyane near Sofia organised a charity bazaar with handmade souvenirs, sweets and drawings. They raised the..
Exactly at midnight, the Patriarch of the Bulgarian Orthodox Church Daniil announced the Resurrection of Christ and greeted the Bulgarians with “Christ is..
“Today, united by the power of our faith in the redemptive sacrifice of Jesus Christ, we celebrate together again and are inspired by His Resurrection...
Monday will be mostly sunny . In some places in the lowlands and valleys in the morning hours there will be short-term fog. Mainly in the Rila-Rhodope..
+359 2 9336 661