The energy regulators of Bulgaria and Greece have certified the Gas Interconnector Greece–Bulgaria (IGB).
The commercial exploitation of the interconnector is set to begin after 1 July, 2022. IGB is of strategic importance and allows for the linking of the Greek and the Bulgarian gas transmission systems, diversifying gas supplies to Bulgaria and Southeastern Europe. The interconnector will enable Bulgaria to receive, in the second half of 2022, the full amount of the 1 billion cubic metres of natural gas negotiated with Azerbaijan. The pipeline’s transmission capacity is 3 billion cubic metres, and will allow delivery of liquefied gas from USA, Algeria, Qatar, Egypt, Nigeria, Israel and Cyprus.
The papers have to be approved by the European Commission, in accordance with European norms, before the certificates enter into force.
The trial of six Bulgarians accused of spying for Russia continues in the United Kingdom. The head of the "spy cell" Orlin Rusev and Biser Dzhambazov pleaded guilty. Three others - Katrin Ivanova, Vanya Gaberova and Tihomir..
Today's eighth attempt by the Bulgarian MPs to elect a speaker of the National Assembly also proved unsuccessful. At the beginning of the day, there was a ray of hope that this time the people's representatives would reach a..
Public attitudes towards HIV/AIDS in Bulgaria show that a quarter of Bulgarians are ready to keep friendships with HIV-positive people, BTA reported. Men are slightly more tolerant than women (28% versus 23%). The data are from a..
Due to the poor condition of the water transmission network, nearly half a billion cubic meters of water are irretrievably lost annually . On this..
"After today's vote for Speaker of the National Assembly, ''We Continue the Change'' (PP) demanded the resignations of Daniel Lorer and Yavor..
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for..
+359 2 9336 661