Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

No pollution from the Kakhovka dam floating towards Bulgaria

Photo: V. Vassileva, Radio Varna

The pollution following the explosion of the Kakhovka dam has been localised in the Odessa area and remains in Ukrainian territorial waters in the Black Sea.

There was no debris drifting towards the territorial waters of Bulgaria and Romania, said Captain Prof. Dr. Miroslav Tsvetkov Nikola Vaptsarov Naval Academy in Varna, reports BNR Varna. 

Based on data on sea currents from the EU's Copernicus Earth observation programme, simulations are being made of the movement and distribution of likely pollutants that would come from Odessa. So far, 30 simulations have been carried out, showing that it is unlikely that these pollutants would reach Bulgarian waters, he explained. Tsvetkov stressed that there is no information about any alarming results in the measurements carried out in Romania either.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Kristian Vigenin

If BSP receives the third mandate, it will try to form expert cabinet (UPDATED)

The return of the second mandate was not unexpected, deputy chairman of the BSP Kristian Vigenin said. According to him, forming a government within the framework of the 50th parliament is increasingly difficult to achieve...

published on 7/22/24 2:28 PM

PP-DB returns the second mandate immediately after it was handed over

President Rumen Radev handed over the second exploratory mandate to form a government to the second largest parliamentary group in the 50th National Assembly - "We Continue the Change" - "Democratic Bulgaria" coalition (PP-DB).  At the handing..

published on 7/22/24 12:14 PM

Caretaker government signs contract for East-West energy corridor feasibility study

A contract between the US Trade and Development Agency and the Electric Power System Operator for the feasibility study for the East-West Energy Corridor was signed at the Council of Ministers.  The funding, amounting to USD 1.2 million, is..

published on 7/22/24 11:26 AM