Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
Wednesday will be mostly sunny. There will be weak to moderate west-northwesterly wind. The lowest temperatures are expected to be between minus 3° and 2°C; in Sofia - around minus 1°C. The highest temperature will reach 10°C to 15°C;..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and Romania to the Schengen Area. The draft document states that from January 1, 2025, checks on persons..
The Constitutional Court has admitted all five requests for the partial or complete annulment of the elections for the 51st National Assembly, submitted by We Continue the Change-Democratic Bulgaria (PP-DB), Vazrazhdane, There is Such a People (ITN),..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
After the meeting with his Vietnamese counterpart Luong Cuong in Hanoi, President Rumen Radev emphasized that Bulgaria will continue to support efforts..
The number of crimes committed in the conditions of domestic violence has gone up by 54% since the beginning of the year compared to last year, the..
+359 2 9336 661