Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
Borislav Sarafov meets all the requirements and has the qualities to be elected Prosecutor General. This position was taken by the committees on attestation and competitions and on professional ethics at the Prosecutors College of the..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian Augustus, announced Prof. Lyudmil Vagalinski who is in charge of the excavations...
President Rumen Radev, who is paying an official visit to Vietnam, delivered a lecture on the occasion of the 75 th anniversary since the establishment of diplomatic relations between the two countries at the Diplomatic Academy of the Ministry of..
The flu season is expected to peak at the end of December and the beginning of January. In an interview with BNT, general practitioner Dr. Gergana..
After the meeting with his Vietnamese counterpart Luong Cuong in Hanoi, President Rumen Radev emphasized that Bulgaria will continue to support efforts..
As of next year, use of solid fuels for domestic heating in buildings which are part of central heating and gas supply networks will be banned in nine..
+359 2 9336 661