“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The first Bulgarian avatar is a woman named Ahinora. Her name means "powerful ruler" and according to the legend, this was the name of the wife of the founder of the Bulgarian state, Asparuh. Ahinora is an influencer who creates at least two posts a..
The third group of 7 people from the 33rd Bulgarian Antarctic Expedition departed from Sofia Airport on January 11. In Rome, they will be joined by Romanian geologist Daniela Paskal, and in Punta Arenas (Chile) they will be joined by journalists..
The Chairperson of the Consumer Protection Commission (CPC), Maria Filipova, announced that price increases by mobile operators are considered an unfair practice and issued an order requiring them to immediately cease applying unilateral changes..
Bulgaria has made significant progress in meeting the criteria for inclusion in the U.S. Visa Waiver Program, caretaker Minister of Foreign..
I have not committed any crime, this is a political attack, the co-chairman of "We Continue the Change" (PP), Kiril Petkov, said before..
The General Consulate of Bulgaria in Los Angeles warned on its Facebook page that the fires in the metropolis have caused water contamination..
+359 2 9336 661