“The Greece-Bulgaria interconnector should be ready by the end of 2021 so that liquefied gas can flow through it from Alexandroupolis - American, Israeli, Egyptian, from many sources. In future its capacity can be increased to 5 billion cubic metres of gas a year,” said Prime Minister Boyko Borissov who conducted an inspection of the construction work.
The project is important for Bulgaria and for the region because if affords the possibility of diversifying natural gas supply sources, the government press service states.
At this time pipes have been distributed along the 150-km. track in preparation of subsequent activity, along 70 kilometres the pipes have been laid in trenches. The pipeline is 182 kilometres long, 150 of which on Bulgarian territory.
The Regional History Museum in Plovdiv is hosting the performance “Hear the Voice of the Mountains and Springs – The Year of the Snake Gives Us Prosperity” today. In it, actors from the Guizhou Lantern Theater will show the rich..
On Saturday, cold air will bring temperatures down. It will be cloudy. There will be rainfalls and snowfalls in the northwestern regions. There will be rainfalls in the eastern regions of the country. The wind will be moderate to..
The Sofia Municipality and the Bulgarian Academy of Sciences will create a register of homeless people in Sofia. The initiative comes from the Institute of Population and Human Research of the Bulgarian Academy of Sciences, which is participating in a..
Bulgaria has made significant progress in meeting the criteria for inclusion in the U.S. Visa Waiver Program, caretaker Minister of Foreign..
I have not committed any crime, this is a political attack, the co-chairman of "We Continue the Change" (PP), Kiril Petkov, said before..
The General Consulate of Bulgaria in Los Angeles warned on its Facebook page that the fires in the metropolis have caused water contamination..
+359 2 9336 661