Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.
The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.
On the first day of the 51st parliament, ITN will initiate the collection of signatures for submitting a complaint to the Constitutional Court concerning the partial cassation of the elections, party leader Slavi Trifonov announced on..
Vazrazhdane calls for a recount of the votes from the early parliamentary elections, party leader Kostadin Kostadinov has told BNR. "It will perhaps show that there are protocols that do not match with the contents of the bags with..
"We Continue the Change - Democratic Bulgaria" are reviewing the video recordings from the election sections in order to collect evidence of vote rigging, PP co-chairman Asen Vassilev told BNR. At the moment when sufficient facts are..
Over 1/3 of the cases of African swine fever among wild boars in Europe have been registered in Bulgaria , the Association of Pig..
An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities..
17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war..
+359 2 9336 661