Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Kalina Konstantinova: Ukrainian women are a high-risk factor for human trafficking

Deputy Prime Minister for Good Governance Kalina Konstantinova
Photo: Council of Ministers, archive

“116,000 Ukrainian refugees have entered Bulgaria since the start of the war and 54,000 of them have remained,” Kalina Konstantinova, Deputy Prime Minister for Good Governance said in an interview with bTV.

According to her, more than 30% of all refugees are children. “In view of the size of the wave we need to find as many places to accommodate them as we can, as soon as we can,” she said further, and added that everything possible is being done to avoid putting up tent camps for the people fleeing Ukraine. Kalina Konstantinova stated further that Ukrainian women are a high-risk factor for human trafficking, and special care should be taken of them. The accommodation of refugees in this country has so far cost the state 6.7 million Leva (EUR 3.4 million).



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria joins European network for cancer care

Bulgaria is joining a European consortium of national cancer centres. Speaking to BNR, Assoc. Prof. Dr. Assia Konsoulova stressed that this is the fruit of many years of effort, "because the Bulgarian patient deserves to be treated in both a cancer centre..

published on 7/8/24 5:58 PM

Code Yellow alert for hot weather issued for all Bulgarian districts on Tuesday

It will be sunny and hot on Tuesday. There will be light to moderate northerly wind. The lowest temperatures will range from 17°C to 22°C, for Sofia 17°C. Maximum temperatures will range from 34°C to 39°C, for Sofia - around 33°C. It will be..

published on 7/8/24 5:20 PM
Reactor No. 6 of the Kozloduy NPP

Kozloduy NPP’s reactor No. 6 reconnected to electricity system

Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a..

published on 7/8/24 11:21 AM