Earlier today Unit 5 of Bulgaria’s Kozloduy NPP has been stopped from operation for planned annual repair works, the NPP press service said. The reactor will be loaded with fresh nuclear fuel for the next fuel cycle. The repair will continue until the second half of May. Unit 6 operates at full capacity. The Deputy Chairman of the Nuclear Regulation Agency Borislav Stanimirov told the Bulgarian National Radio that during the planned annual repair of Unit 5 part of the measures were aimed at upgrading the reactor’s capacity. The Electricity System Operator has said that the energy system of the country has enough capacities to replace the 1000 MW unit under repair.
Overnight it will be clear and almost quiet. Sunday will be sunny, with cumulus clouds over the mountains and mountainous areas in the afternoon. In some places, mainly in the Rila-Rhodope area, it will rain, possibly even thunder. Maximum..
The BSP will remain in opposition and will not support a government with the mandate of neither GERB, nor DPS. The decision was taken by the BSP National Council. This is what Atanas Zafirov told journalists, who will serve as interim chairman of the BSP..
Bulgaria is among the countries in Europe where the tiger mosquito, which carries viruses such as dengue and zika, has become established. This was announced by the European Centre for Disease Prevention and Control and warned of a rise in mosquito-borne..
After last night's storm, accompanied by hail and strong winds, several municipalities in Bulgaria suffered serious damages and..
Speaking in Stara Zagora at the Fourth National Convention of the Reserve Army, President Rumen Radev stressed the need for basic military training for..
Rainfall in Bulgaria so far has been below climate norms. Viktoria Kleshtanova, a weather analyst at the National Institute for Meteorology and Hydrology..
+359 2 9336 661