The interconnector with Greece near Komotini is expected to be completed by the end of June and the Azeri gas to flow through it to Bulgaria in September, Prime Minister Kiril Petkov, who inspected the gas route today, said.
According to PM Petkov, Bulgaria has three alternative sources of gas if supplies from Russia are cut off. "This facility can bring 3 bcm, which is Bulgaria's approximate consumption. There are also gas connections through Mesemviria and Turkey, so we are absolutely ready for such a scenario," he said.
Kiril Petkov reminded that the purpose of the interconnector between Bulgaria and Greece was to link the gas transmission networks of the two countries and provide access to the Southern Gas Corridor and a number of new sources of natural gas.
On Monday there will be snow showers or a mix of rain and snow in many places. The precipitation will decrease and stop, and the clouds will clear in the evening. The minimum temperature will be minus 3°C, around minus 1°C in Sofia, and the maximum will..
After a fire destroyed the roof of the historic National High School of Applied Arts in Tryavna on Friday morning, students are taking a week-long emergency break. With the help of the fire brigade, civil protection teams and local businesses, the..
The large-scale inspection, carried out by the competent police structures of the National Police Directorate and the regional directorates of the Interior Ministry, will continue next week to get the full picture - where, what and how many are the..
Ways to improve the positions of the sides to the contract between Bulgaria’s Bulgargaz, Bulgartransgaz and Türkiye’s BOTAŞ will be discussed until..
A wave of outrage is sweeping over Bulgaria after a severe accident on the Telish-Radomirtsi road (Pleven region), in which 12-year old Siyana lost her..
Over the next 24 hours the weather in the country will be dynamic. After temporarily dispersing, after midnight the clouds will increase and the..
+359 2 9336 661