After a long debate, the National Assembly decided that Kozloduy NPP- New Builds and Hyundai Engineering & Construction hold negotiations by April 15. Hyundai was shortlisted as a potential contractor for the engineering, construction and commissioning of Units 7 and 8 at Kozloduy NPP, using Westingouse’s AP 1000 technology.
After a re-vote, the decision was adopted with 112 votes in favour, 29 against and 82 abstentions. With 52 votes in favour, 161 against and 8 abstentions, the parliament rejected another draft decision submitted by "We Continue the Change-Democratic Bulgaria" to hold parallel negotiations with Hyundai and the American company Bechtel.
The National Statistical Institute (NSI) expects a high evaluation from the inspection of the Organisation for Economic Co-operation and Development (OECD), said NSI President Assoc. Prof. Dr. Atanas Atanasov. A report will be released by the end..
In the modern world, it is no longer enough to know the individual monetary units of countries and to know how their currencies relate to the Bulgarian lev. Converting leva into euros and vice versa is not part of financial literacy in today's extremely..
The Romanian company OMV Petrom, which is part of the Austrian OMV, has taken over as operator of the Han Asparuh perimeter in Bulgaria. OMV Petrom replaced Total Energies as the operator of the Han Asparuh deep water perimeter in Bulgaria, according to..
+359 2 9336 661