Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.
The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.
"When I look at the CCTV footage, I have the feeling that some of the sectional election commissions did not work according to the rules." That is how chair of the CEC, Kamelia Neikova, commented information about manipulations related..
By order of caretaker Prime Minister Dimitar Glavchev, the institutions are ready to provide assistance to Spain after the floods in Valencia, the Council of Ministers reported. If the authorities in Madrid request support,..
In the elections on October 27 this year there were problems in both phases of the process - when the votes were submitted and when they were counted, former acting minister of interior Ivan Demerdzhiev told the BNR. According to him,..
Over 1/3 of the cases of African swine fever among wild boars in Europe have been registered in Bulgaria , the Association of Pig..
An engineering contract for the construction of new capacity at the Kozloduy Nuclear Power Plant (NPP) has been signed by NPP Kozloduy - New Capacities..
17 drifting mines have been discovered and destroyed in the Black Sea by the Naval Forces of Bulgaria, Romania and Turkey since the beginning of the war..
+359 2 9336 661