After completion of work on the modernization of Unit 5 of the Kozloduy NPP for upgrading power performance up to 104 percent, carried out during the scheduled annual maintenance for this year, final testing is set for 13 and 14 July 2019.
The aim is to confirm readiness of the systems and equipment for performance in the conditions of upgraded power capacity in different modes of operation. A similar test programme was applied to Unit 6 of Kozloduy NPP in 2017. It now functions at full capacity - 1040 MWe.
Bulgaria will assist Ukraine in the process of rebuilding its energy infrastructure. This was announced after a meeting between Bulgaria’s Energy Minister Vladimir Malinov and Ukraine’s ambassador to Bulgaria Olesya Ilashchuk. “Deepening..
The Parliamentary Committee on Tourism has adopted at first reading the Bill for Amendments to the Foreigners in the Republic of Bulgaria Act, submitted by Manoil Manev and Temenuzhka Petkova from the GERB-SDS parliamentary group, which..
The leader of GERB, Boyko Borissov, announced that a second "assemblage" with "We Continue the Change - Democratic Bulgaria" after the elections cannot exist. In response to a journalist's question regarding an accusation made by..
On Saturday, minimum temperatures in the country will be between 5 and 10°C, around 5°C in Sofia. The morning will be sunny. In the afternoon it will be..
Ground forces military personnel destroyed an unexploded ordnance found yesterday in Vazrazhdane residential area of Sofia, the press service of the..
Conditions for mountain hiking are good until midday, with the exception of the Balkan Range, where there will be fog and rain, the Mountain Rescue..
+359 2 9336 661