Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Operational readiness of Unit 5 of Kozloduy NPP tested for upgraded power performance

Photo: BGNES

After completion of work on the modernization of Unit 5 of the Kozloduy NPP for upgrading power performance up to 104 percent, carried out during the scheduled annual maintenance for this year, final testing is set for 13 and 14 July 2019.

The aim is to confirm readiness of the systems and equipment for performance in the conditions of upgraded power capacity in different modes of operation. A similar test programme was applied to Unit 6 of Kozloduy NPP in 2017. It now functions at full capacity - 1040 MWe. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Weather forecast: A warm and sunny Sunday

On Sunday the weather will be predominantly sunny, with cumulus clouds forming in the East in the afternoon though there is a slim chance of rain. There will be a light to moderate wind from the East-Northeast. Minimum temperatures 5-10° C., for..

published on 4/27/24 6:00 PM

Unfair practices checks in organized tourist travel

As the active season is set to begin, the Ministry of Tourism started checks into unfair practices in organized tourist travel. Two of the tour operators checked so far have not provided a certificate for carrying our tour operator activity and..

published on 4/27/24 2:48 PM

Unexploded ordnance, found in a Sofia neighbourhood, has been destroyed

Ground forces military personnel destroyed an unexploded ordnance found yesterday in Vazrazhdane residential area of Sofia, the press service of the Ministry of Defence has announced. The ordnance was a corroded air bomb. The bomb was destroyed..

published on 4/27/24 10:56 AM