A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
Long lines of trucks and cars have formed at the border with Turkiye, reported Nova TV. The line of trucks on the Maritsa motorway has reached Svilengrad and is over 12 kilometres long, which is due to the increased traffic before the holidays...
During the night, the cloud cover will increase from the west, but there will still be no precipitation. The weather will remain clear in the eastern parts of the country. The lowest temperatures will range from minus 3°C to 2°C, slightly higher in..
The renovation of the Kulata border checkpoint has begun in connection with Bulgaria's upcoming entry into Schengen on January 1. There will be two lanes in each direction before the checkpoint. A new 200-meter lane is being built on Bulgarian..
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of..
Representatives of 4 clubs of the Macedonian Patriotic Organization (MPO) in North America met at the Church of the Holy Spirit in Youngstown. The host..
The spy network of Bulgarians led by Austrian Jan Marsalek in the UK had an agent in Austria , Austrian and German media reported, quoted by BGNES...
+359 2 9336 661