A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
On Saturday, minimum temperatures in the country will be between 5 and 10°C, around 5°C in Sofia. The morning will be sunny. In the afternoon it will be cloudy in the mountains, where rain and snow will fall, and sunny in the east. Maximum temperatures..
An emergency epidemic situation will not be introduced in the country due to the spread of pertussis (whooping cough), as this is not necessary. This was announced by the chief state health inspector, Assoc. Prof. Angel Kunchev...
With the votes of GERB-SDS and PP-DB, the parliament rejected the request for a debate on the report of the temporary committee to investigate corruption practices in the "Customs" Agency and the possible role of the former finance..
The Bulgarian Parliament has finally postponed the liberalisation of the energy market for one year, starting from 1 July. The decision was taken with..
Nearly 400 cases of pertussis (whooping cough) have been registered in the country. We are at the beginning of a nationwide epidemic, Chief State Health..
The National Assembly removed its chairman Rosen Zhelyazkov from office. His dismissal was proposed by We Continue the Change - Democratic Bulgaria,..
+359 2 9336 661