A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
Delyan Peevski launched an alternative website of the Movement for Rights and Freedoms (DPS) at https://dpsbg.eu/ . This website includes information about the latest media statements of one of the DPS chairmen, Delyan Peevski. The old website..
Bulgaria will be the intersection point of two NATO logistics transport corridors. Under an agreement signed at the NATO Summit in Washington, Italy, Albania, North Macedonia and Bulgaria will cooperate within the Pan-European Transport Corridor No...
Most political forces in parliament commented on what is happening in the Movement for Rights and Freedoms (DPS) as internal problems of DPS. According to the chairman of the GERB-SDS parliamentary group, Boyko Borissov, the fact that there is a..
The start of the major repair of the Danube Bridge near Ruse is the reason for a serious conversation about the connectivity between..
The Chairman of the GERB-SDS Parliamentary group, Boyko Borissov, sent an official refusal to the Movement for Rights and Freedoms (DPS) and confirmed..
The largest archaeological campaign ever conducted on Perperikon has begun, BTA reports. Prof. Nikolay Ovcharov, head of the research at..
+359 2 9336 661