A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
The parliamentary group of the Movement for Rights and Freedoms (DPS) has excluded 17 MPs. Among them is the co-chairman Dzhevdet Chakarov. The decision was read in the plenary hall by the Deputy Speaker of the National Assembly,..
We discussed how to make NATO stronger, focusing on the collective, while at the same time strengthening the defense of each member country, caretaker Prime Minister Dimitar Glavchev said. He added that in the discussions in..
In an appeal to the DPS members, the honorary chairman of the DPS, Ahmed Dogan, demanded the resignation of the chairman of the parliamentary group, Delyan Peevski, and that of five other prominent names in the Movement for Rights and..
The start of the major repair of the Danube Bridge near Ruse is the reason for a serious conversation about the connectivity between..
The Chairman of the GERB-SDS Parliamentary group, Boyko Borissov, sent an official refusal to the Movement for Rights and Freedoms (DPS) and confirmed..
The largest archaeological campaign ever conducted on Perperikon has begun, BTA reports. Prof. Nikolay Ovcharov, head of the research at..
+359 2 9336 661