A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
The Chairman of the GERB-SDS Parliamentary group, Boyko Borissov, sent an official refusal to the Movement for Rights and Freedoms (DPS) and confirmed the coalition's position that they will not participate in negotiations to form a government with..
The Movement for Rights and Freedoms (DPS) is against the attempts of the anti-European and pro-Russian parties to play with the topic of "referendum for the euro". In a position published by the press center of the DPS, the chairman..
The start of the major repair of the Danube Bridge near Ruse is the reason for a serious conversation about the connectivity between Bulgaria and Romania. Along the 409 km long border, there are just two bridges and 5 ferries, some of..
The start of the major repair of the Danube Bridge near Ruse is the reason for a serious conversation about the connectivity between..
The Chairman of the GERB-SDS Parliamentary group, Boyko Borissov, sent an official refusal to the Movement for Rights and Freedoms (DPS) and confirmed..
The largest archaeological campaign ever conducted on Perperikon has begun, BTA reports. Prof. Nikolay Ovcharov, head of the research at..
+359 2 9336 661