A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
The traditional swim across the Danube River near Silistra will take place at 9:00 am on August 10. Those wishing to participate can register just before the start but must undergo a medical examination and instructions . Dozens of swimmers take part..
Educational, creative and entertaining events await the youngest guests at Stage Central Halls in Sofia. Between 2:00 pm and 5:00 pm on August 7, children will have the opportunity to attend a Children's Coppersmith Workshop (suitable for children..
Caretaker Prime Minister Dimitar Glavchev stated that he will accept a proposal to be caretaker PM again if President Rumen Radev assigns him this position. President of Bulgarian Parliament Raya Nazaryan refuses to be caretaker PM “I..
The caretaker government has allowed the Bulgarian military to train Ukrainian soldiers on the territory of NATO member states. The reasoning states that..
There is a high probability that this would be the last regular meeting of the Council of Ministers, caretaker Prime Minister Dimitar..
Consumer confidence rose by 5.6 points in July, according to a survey by the National Institute of Statistics. According to consumers, the general..
+359 2 9336 661