A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
Kozloduy Nuclear Power Plant and Westinghouse Electric Company concluded a contract on the licensing of fuel for Unit 6 of the NPP, the Bulgarian Ministry of Energy has announced. The signing, which took place in Sofia, was attended by caretaker..
Kozloduy Nuclear Power Plant and Westinghouse Electric Company concluded a contract on conducting a safety analysis for the licensing of an alternative nuclear fuel type for Unit 6 of the NPP. The signing was attended by caretaker Minister of..
There is no immediate danger to the Bulgarian waters or to the Bulgarian coastline. The oil spill is drifting to the Southeast of Kerch Bay and to the North of the Kerch strait, and there exists a serious danger of pollution of the Sea of Azov, said..
According to the Bulgarian Embassy in Berlin, there is currently no information about Bulgarian citizens injured after the terrorist attack in the city of..
Representatives of 4 clubs of the Macedonian Patriotic Organization (MPO) in North America met at the Church of the Holy Spirit in Youngstown. The host..
The spy network of Bulgarians led by Austrian Jan Marsalek in the UK had an agent in Austria , Austrian and German media reported, quoted by BGNES...
+359 2 9336 661