A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
Vazrazhdane and There Is Such a People (ITN) are to submit, to the National Assembly, a draft decision for the holding of a referendum on preserving the Bulgarian Lev, said Vazrazhdane MP Tsoncho Ganev. This is an initiative which the previous..
Answering a question in parliament, caretaker Minister of Culture Maestro Nayden Todorov stated that the National Culture Fund has a staff of only 11, people who have to distribute millions of euro for culture under the Recovery and Resilience Plan...
During a discussion with US President Joe Biden at the 75 th anniversary NATO summit in Washington DC, Bulgaria’s caretaker Prime Minister Dimitar Glavchev stated that Bulgaria is a loyal and reliable ally. On his part, President Biden expressed..
The start of the major repair of the Danube Bridge near Ruse is the reason for a serious conversation about the connectivity between..
The Chairman of the GERB-SDS Parliamentary group, Boyko Borissov, sent an official refusal to the Movement for Rights and Freedoms (DPS) and confirmed..
The largest archaeological campaign ever conducted on Perperikon has begun, BTA reports. Prof. Nikolay Ovcharov, head of the research at..
+359 2 9336 661