Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Operational readiness of Unit 5 of Kozloduy NPP tested for upgraded power performance

Photo: BGNES

After completion of work on the modernization of Unit 5 of the Kozloduy NPP for upgrading power performance up to 104 percent, carried out during the scheduled annual maintenance for this year, final testing is set for 13 and 14 July 2019.

The aim is to confirm readiness of the systems and equipment for performance in the conditions of upgraded power capacity in different modes of operation. A similar test programme was applied to Unit 6 of Kozloduy NPP in 2017. It now functions at full capacity - 1040 MWe. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Veselina Nalbantov

Veselin Nalbantov: There is shortage of staff in tourist sector, consulates demand kickbacks from potential foreign workers

"Money for salaries in the tourist sector has increased many times, but there are no staff in Bulgaria."   This statement about the state of the tourism industry in Bulgaria was made by Veselin Nalbantov, Deputy Chairman of the Bulgarian Hotel and..

published on 4/25/24 3:08 PM

Miners block centre of Sofia 

Thousands of miners and energy workers, members of the two main trade unions, the Confederation of Independent Trade Unions in Bulgaria (CITUB) and the trade union "Podkrepa", gathered in the area between the buildings of the National Assembly and the..

published on 4/25/24 3:07 PM
Rosen Zhelyazkov

Parliament removes National Assembly Speaker Rosen Zhelyazkov from office

The National Assembly removed its chairman Rosen Zhelyazkov from office. His dismissal was proposed by We Continue the Change - Democratic Bulgaria, Vazrazhdane and BSP for Bulgaria. 129 MPs voted in favour and 103 MPs voted against. Rosen..

published on 4/25/24 11:46 AM